EV charging
6 min read
·
Does an EV charger need a new panel?

Lena Fischer
EV and solar specialist

About four homes in ten need more capacity before a Level 2 charger goes in. The other six do not, and a good electrician will tell you which you are before quoting anything.
The short answer
If your panel is 200A and has two free slots, you almost certainly do not need an upgrade. If it is 100A and already runs an electric dryer or range, you probably do, or you need a load management device.
How to read your panel
Open the panel door. The main breaker at the top has a number on it: 100, 125, 150 or 200. That is your service size in amps.
Rule of thumb
A Level 2 charger wants a 60A breaker. On a 100A panel, that is more than half of everything you have.
The load calculation
Service size is only half the picture. What matters is how much the house actually draws at its busiest. We add up every large appliance using the method in the electrical code, then see what is left.
Three ways to fix it
✓
Upgrade the panel to 200A, which also prepares you for a heat pump
✓
Fit a load-management device that pauses charging when the house is busy
✓
Install a lower-power charger that adds 15 miles of range an hour
What it costs
These are our fixed prices in Austin. Yours may differ, but the gaps between them will be similar.
Charger only
Capacity available, under 30 ft
$649
Charger with load management
No panel upgrade needed
$1,090
Charger with a 200A panel
Both jobs in one visit
$2,099

Lena Fischer
EV and solar specialist. Has fitted more than 600 home chargers since 2018.
Share
X
Copy link


